Tuesday 31st August
Excavation blog by Callum Hamilton On our group’s final day of excavation, we began our day by continuing with our section drawings of the trench and filling out the respective context sheets to go along with them. In small groups we took turns drawing so…
Monday 30th August
Excavation blog by Ross Dempster This is our sixth day of excavations on the site, and it proved quite cold and windy compared to the glorious sunshine of last week. By this stage, much of the rampart has been exposed by trowelling and it is…
Friday 27th August
Excavation Blog by Findlay Cormack Today on the fifth day of our Holyrood Park field school, we in the excavation team continued our work to remove any excess pebbles and soil surrounding parts of the rampart revealed in the previous days. Using trowels and brushes,…
Thursday 26th August
Excavation blog by Garion Adams Today will be the fourth day of work and in effect the third of practical excavation on site in the park. We set quickly off to pick up where we had left off, furthering what we had done in previous…
Wednesday 25th August
Excavation blog by Verity Limond Excavation continued apace today as the team trowelled away the loose gravel and archaeologically-barren topsoil that cover older layers. As the digging progressed, we could see the earth changing colour and texture, from looser brown gravelly soil to a blacker…